Budownictwo i Architektura (Dec 2010)
Bridge over the Giełczew river in Piaski – building works quality control
Abstract
Article describes rebuilding of the bridge from the side of works quality control. Tests carried out during construction time were performed with analyses and conclusions. In summary article presents how important is quality control on the building site as well appropriate selection and number of tests.
Keywords