Analysis of the Power Supply Restoration Time after Failures in Power Transmission Lines
Alexander Vinogradov,
Vadim Bolshev,
Alina Vinogradova,
Michał Jasiński,
Tomasz Sikorski,
Zbigniew Leonowicz,
Radomir Goňo,
Elżbieta Jasińska
Affiliations
Alexander Vinogradov
Laboratory of Power Supply and Heat Supply, Federal Scientific Agroengineering Center VIM, 109428 Moscow, Russia
Vadim Bolshev
Laboratory of Power Supply and Heat Supply, Federal Scientific Agroengineering Center VIM, 109428 Moscow, Russia
Alina Vinogradova
Laboratory of Power Supply and Heat Supply, Federal Scientific Agroengineering Center VIM, 109428 Moscow, Russia
Michał Jasiński
Department of Electrical Engineering Fundamentals, Faculty of Electrical Engineering, Wroclaw University of Science and Technology, 50-370 Wroclaw, Poland
Tomasz Sikorski
Department of Electrical Engineering Fundamentals, Faculty of Electrical Engineering, Wroclaw University of Science and Technology, 50-370 Wroclaw, Poland
Zbigniew Leonowicz
Department of Electrical Engineering Fundamentals, Faculty of Electrical Engineering, Wroclaw University of Science and Technology, 50-370 Wroclaw, Poland
Radomir Goňo
Department of Electrical Power Engineering, Faculty of Electrical Engineering and Computer Science, VSB-Technical University of Ostrava, 708 00 Ostrava, Czech Republic
Elżbieta Jasińska
Faculty of Law, Administration and Economics, University of Wroclaw, 50-145 Wroclaw, Poland
This paper presents the analysis of power supply restoration time after failures occurring in power lines. It found that the power supply restoration time depends on several constituents, such as the time for obtaining information on failures, the time for information recognition, the time to repair failures, and the time for connection harmonization. All these constituents have been considered more specifically. The main constituents’ results values of the power supply restoration time were analyzed for the electrical networks of regional power supply company “Oreolenergo”, a branch of Interregional Distribution Grid Company (IDGC) of Center. The Delphi method was used for determining the time for obtaining information on failures as well as the time for information recognition. The method of mathematical statistics was used to determine the repair time. The determined power supply restoration time (5.28 h) is similar to statistical values of the examined power supply company (the deviation was equal to 9.9%). The technical means of electrical network automation capable of the reduction of the power supply restoration time have also been found. These means were classified according to the time intervals they shorten.