Reduction of terms of demolition works of fully assembled residential buildings in Moscow

  • Slavina Anastasiia,
  • Bychkov Aleksej,
  • Dzhusoev German,
  • Borisova Margarita

DOI
https://doi.org/10.1051/e3sconf/20199108008
Journal volume & issue
Vol. 91
p. 08008

Abstract

Read online

As of the end of 2017, in Moscow, there are 286 mapped five-story fully-assembled residential buildings of K-7, II-32, II-35, 1605-AM, 1MG-300 series with total area of 1046,7 thousand square meters. They were built at the beginning of the era of mass construction, in 1959 - 1962 years, and were distinguished by thin outer walls of lightweight ribbed expanded clay panels with unstable thermal protection properties. The technologies used in the construction of such buildings do not allow reconstructing them. Nowadays, the task of demolition of the neighborhood of five-storey houses in Moscow with the maximum possible reduction in terms of production of works and the maximum quality of work is very important. It is also necessary to ensure safe work and compliance with all sanitary standards. The order of execution of the works has a mathematical solution method. It identifies issues that arise in the alternating sections performing the process of demolition.