Građevinar (Oct 2016)

Repair of Krk Bridge

  • Boris Huzjan,
  • Nina Ostojić

DOI
https://doi.org/10.14256/JCE.1430.2015
Journal volume & issue
Vol. 68, no. 09.
pp. 735 – 743

Abstract

Read online

The construction chronology of both arches of the Krk Bridge is described, and specific features of the site on which the bridge was built are given. The influence of the arches on the reinforced concrete structure of the bridge is explained. A general overview of analyses conducted on the small and large arches of the bridge is given, and the proposed repair and protection solutions are presented. The results of the last chloride penetration analysis, and the report submitted after final repair, are described in great detail.