Annals of the University of Petroşani. Mechanical Engineering (Jan 2024)
STUDY THE ADAPTATION AND FIXATION CHAIN ENDS ON ADVANCE MECHANISM OF 2K-52MU COMBINE TO THE STATIONS OF THE TR-5 SCRAPER CONVEYOR
Abstract
The need for the mechanization of coal exploitation in the mines of Vale Jiului, under the conditions of the current economic crisis, required the adaptation of the existing machinery to the new conditions for the re-technology of some cutting sites.