APPLICATION OF ELECTRONIC TACHEOMETER FOR PREAND POST-CONSTRUCTION SURVEY OF ELEVATOR SHAFT

  • M. S. Nesterionok,
  • V. N. Veksin

Journal volume & issue
Vol. 0, no. 2
pp. 38 – 41

Abstract

Read online

Floor-by-floor survey of installed elements of an elevator shaft using coordinate method and tacheometer is also inhibited by the necessity to determine device installation points for floors of every mounting horizon that leads to additional measurements due to conditions of the completed building framework and presence of a great number of situational disturbances and then it entails significant time expenditure and diminution of accuracy in the obtained results. Technical capabilities of the modern electronic tacheometer substantially simplify an accomplishment of the mission because the device can be applied not only in function of vertical projection but it can be used for preand post-construction survey of the elevator shaft with the help of advanced radiation method. While using the given method the electronic tacheometer equipped with diagonal ocular is installed over a bearing sign in the elevator pit and control points of the elevator shaft are determined with the help of specially developed portable beam deflector in the form of disc with radius r, which is fixed to a handle rod and orientated perpendicularly to a laser beam. An innovation diagram for preand post-construction survey of elevator shaft has been developed while applying this type of deflector. The diagram is characterized by high efficiency due to the fact that one tacheometer installation makes it possible to execute highly accurate, complete plane and high-level surveying of the whole elevator shaft including doorways, door sills and jambs.The paper proposes a new method for pre and post construction survey of the elevator shaft using the electronic tacheometer while applying specially developed beam deflector that ensures a geometric fixing of one or simultaneously two surveying points to spatial coordinate system where the preand post-construction survey is carried out. The method is characterized by high geometric accuracy and technological efficiency.

Keywords