Energy Reports (Nov 2021)
Layout and power generation estimation of 50 MW wind turbine in Dayingpo
Abstract
In the feasibility study of wind power generation project, wind turbine selection, layout and power generation estimation of wind farm are the core contents. According to the analysis needs of Dayingpo project, this paper first introduces the geographical location and wind energy resources of Lan county Dayingpo 50MW wind power generation project. Based on the above work, the optional fans are selected. As a result, WTG1-2200 and WTG2-2500 are selected for layout. According to the actual terrain and wind energy resources of Dayingpo, a total of 22 fans are arranged, including 17 WTG 1-2200 and 5 WTG 2-2500. According to the above contents, the annual on grid power reduction coefficient of the wind farm, the annual on grid power of the wind farm, and the single unit power generation results of WTG1-2200 and WTG2-2500 are estimated in detail, respectively. Finally, according to the actual terrain and fan layout scheme, the suggestions for the next practical project are proposed.