Geodetski Vestnik (Jan 2009)

Ureditev podatkov DTK 5 : DTK 5 Data Arangement

  • Saša Bobnar

Journal volume & issue
Vol. 53, no. 4
pp. 738 – 744

Abstract

Read online

SI: V prvi polovici leta 2009 je Geodetska uprava skupaj z Geodetsko družbo, d. o. o., iz Ljubljane izvedla projekt ureditve podatkov in vzpostavitve enotne objektne baze DTK 5. Podatki, ki so se hranililočeno za vsak posamezen list razdelitve TTN 5, so se vsebinsko poenotili, topološko uredili, objekti na robovih listov fizično združili in uvozili v bazo »ESRI Geodatabase«. V delovnem okolju ArcGIS Map Desktop so bile izdelane dodatne funkcionalnosti zapreprosto ravnanje z bazo, in sicer za uvoz in izvoz podatkov za reambulacijo ter izvoz za izdajanje podatkov. Nove rutine ponujajo številne možnosti: izvoz listov v skladu z razdelitvijo TTN 5 ali poljubnega območja, transformacijo izvoženih podatkov v novdržavni koordinatni sistem ETRS89/TM, izvoz samo nekaterih tematik, samodejno izdelavo geokodiranih rastrskih kart z izvenokvirno vsebino ali brez nje idr. Baza se bo dopolnjevala in ažurirala med projektizajema in reambulacije DTK 5. Nazadnje bo postala temeljna evidenca topografskih podatkov velikega merila.EN: In the first half of the year 2009, the Surveying and Mapping Authority together with Geodetska družba d.o.o. of Ljubljana carried out a project of data arrangement and established DTK 5, a unified object database. The data, stored separately for each singlesheet of TTN 5, have been uniformed by the content and edited topologically; the objects at the edges of sheets have been physically joined together, and imported into ESRI Geodatabase. Some additional functionalities for simple manipulation of the databasehave been implemented within the ArcGIS Map Desktop working environment, e.g. the import and export of data for updating and export for issuing the data. The new routines offer many options: the export from Geodatabase cut in division of TTN 5 sheets or arbitrary areas, transformation of the exported data into a new state coordinate system (ETRS89/ TM), export of only certain datasets, the automatic production of geo-coded raster maps with or withoutmarginal content etc. The DTK 5 database will be supplemented and updated during the capture and updating projects. In the final stage, it will represent an essential evidence of large-scale topographic data.

Keywords