Applied Sciences (Apr 2022)
Research on an Evaluation Method for the Adaptability of TBM Tunnelling
Abstract
When a TBM carries out tunnelling in complex strata, there is often low tunnelling efficiency and an increase in tunnelling costs due to the improper selection of tunnelling parameters, the wrong estimation of geological conditions, or adverse geology, so it is necessary to evaluate the tunnelling adaptability of TBM construction. In this paper, based on hydraulic engineering in Xinjiang, 11 evaluation indexes of TBM tunnelling adaptability are determined by comprehensively considering the influence of tunnelling parameters, geological conditions, and adverse geological factors on TBM tunnelling adaptability. After that, the membership function of each evaluation index is determined by referring to the existing research results and fuzzy mathematics method, and the weight of each evaluation index is determined and adjusted by the analytic hierarchy process (AHP)–entropy weight (EW) method. Finally, the adaptability evaluation method and evaluation model of TBM tunnelling are put forward. The TBM tunnelling adaptability evaluation model proposed in this paper is verified by relying on the actual situation of three interval tunnels in the project, and good effects are obtained. This study can provide a reference for the evaluation of TBM tunnelling adaptability in similar strata.
Keywords