Shanghai Jiaotong Daxue xuebao (Aug 2024)

Opportunistic Maintenance Modeling of Large-Scale Hot Rolling Production Line Based on Maintenance Priority and Dual Variable Time Window

  • MAO Wenxin, ZHOU Xiaojun

DOI
https://doi.org/10.16183/j.cnki.jsjtu.2023.173
Journal volume & issue
Vol. 58, no. 8
pp. 1221 – 1230

Abstract

Read online

To solve the problem of differential maintenance demand caused by daily dynamic maintenance and periodic replacement of support rolls in large-scale hot rolling lines, a maintenance priority rule is introduced to identify maintenance judgment order of components under long distance condition and downtime constraint. A dual variable time window rule is constructed to identify whether components should be maintained and distinguish maintenance demand, and then a dynamic opportunity maintenance model is established for the system. The case study shows that the model can effectively solve the problem of differential maintenance scheduling for large-scale hot rolling lines under the constraints of maintenance resources and downtime, and has more cost advantages than the traditional time-window-based model.

Keywords