Georesursy (Dec 2020)

On increasing the productive time of drilling oil and gas wells using machine learning methods

  • Anatoliy N. Dmitrievsky,
  • Alexander G. Sboev,
  • Nikolai A. Eremin,
  • Alexander D. Chernikov,
  • Aleksandr V. Naumov,
  • Artem V. Gryaznov,
  • Ivan A. Moloshnikov,
  • Sergei O. Borozdin,
  • Elizaveta A. Safarova

DOI
https://doi.org/10.18599/grs.2020.4.79-85
Journal volume & issue
Vol. 22, no. 4
pp. 79 – 85

Abstract

Read online

The article is devoted to the development of a hybrid method for predicting and preventing the development of troubles in the process of drilling wells based on machine learning methods and modern neural network models. Troubles during the drilling process, such as filtrate leakoff; gas, oil and water shows and sticking, lead to an increase in unproductive time, i.e. time that is not technically necessary for well construction and is caused by various violations of the production process. Several different approaches have been considered, including based on the regression model for predicting the indicator function, which reflects an approach to a developing trouble, as well as anomaly extraction models built both on basic machine learning algorithms and using the neural network model of deep learning. Showing visualized examples of the work of the developed methods on simulation and real data. Intelligent analysis of Big Geodata from geological and technological measurement stations is based on well-proven machine learning algorithms. Based on these data, a neural network model was proposed to prevent troubles and emergencies during the construction of wells. The use of this method will minimize unproductive drilling time.

Keywords