International Journal of Industrial Engineering Computations (Apr 2014)

An economic production model for time dependent demand with rework and multiple production setups

  • S.R. Singh,
  • Shalini Jain,
  • S. Pareek

DOI
https://doi.org/10.5267/j.ijiec.2013.10.003
Journal volume & issue
Vol. 5, no. 2
pp. 305 – 314

Abstract

Read online

In this paper, we present a model for time dependent demand with multiple productions and rework setups. Production is demand dependent and greater than the demand rate. Production facility produces items in m production setups and one rework setup (m, 1) policy. The major reason of reverse logistic and green supply chain is rework, so it reduces the cost of production and other ecological problems. Most of the researchers developed a rework model without deteriorating items. A numerical example and sensitivity analysis is shown to describe the model.

Keywords