Tạp chí Khoa học Đại học Mở Thành phố Hồ Chí Minh - Kinh tế và Quản trị kinh doanh (Aug 2021)

Factors affecting cost overrun of infrastructure projects in Ho Chi Minh City

  • Trần Phạm Khánh Toàn

DOI
https://doi.org/10.46223/HCMCOUJS.econ.vi.16.3.1979.2021
Journal volume & issue
Vol. 16, no. 3
pp. 165 – 179

Abstract

Read online

This article identifies the factors as well as examines the impact of these factors on cost overrun in infrastructure construction projects in Ho Chi Minh City. Data was collected from 184 officials, civil servants, engineers who are participating in the construction. Using the method of testing the reliability of scale (Cronbach’s Alpha), exploratory factors analysis, and multivariate regression analysis, the results show that six factors that are causing cost overrun in an increasing order include: (1) Policies; (2) Natural and social condition; (3) Economic situations; (4) Advisory’s capability; (5) Contractors’ capability; (6) Project leadership skills and experience. In addition, the study found no difference in the estimation cost overrun in the projects of people with different experiences and involved in various types of projects.

Keywords