ITM Web of Conferences (Jan 2022)

Implementation and optimization suggestions for ISI items of CPR1000 steam generator

  • Li Tian,
  • Zeng Qingyue,
  • Pan Guosheng,
  • Xue Donglin

DOI
https://doi.org/10.1051/itmconf/20224703023
Journal volume & issue
Vol. 47
p. 03023

Abstract

Read online

The implementation logic of different ISI items of steam generator during the refueling outage of the nuclear power plant was studied. Based on the implementation relationship between the implementation window and the main line plan of the refueling outage, some optimization suggestions on the planning, preparation and implementation of relevant items were given, aimed at reducing the inspection time of SG ISI items and reducing the collective dose of the inspectors.