Budownictwo o Zoptymalizowanym Potencjale Energetycznym (Oct 2019)

Managing the tasks of employees in the construction industry

  • Marek Krynke

DOI
https://doi.org/10.17512/bozpe.2019.1.15
Journal volume & issue
Vol. 8, no. 1
pp. 137 – 145

Abstract

Read online

The proper organization of work is to set the workflow to the slightest effort of man and machine operation to obtain maximum results. The article presents the problem of the allocation personnel, that occurs in a real company that provides construction services. The mathematical model for this issue was formulated. An algorithm solving the problem of personnel allocation is presented. The proposed analysis is a starting point for determining the production capacity and load of each workstation, which is particularly important when using multi-station work.