Inżynieria Ekologiczna (Dec 2016)

ANALYSIS OF HYDRAULIC LOAD OF SELECTED WASTEWATER TREATMENT PLANT IN JASŁO COUNTY

  • Dariusz Piotr Młyński,
  • Krzysztof Chmielowski

DOI
https://doi.org/10.12912/23920629/65496
Journal volume & issue
Vol. 50
pp. 171 – 178

Abstract

Read online

The paper presents an analysis of hydraulic load in selected a wastewater treatment plant (WTP) in Jasło County: in Przysieki, Kołaczyce and Szebnie. The study was based on the records of daily sewage volume entering the treatment plants within a multi-year period of 2011-2014. The analysis took into account the average daily amount of incoming sewage, the maximum daily peaking factor for the incoming sewage, changes in the sewage volume depending on specific month and the intervals with the greatest frequency of occurrence were designated. The analysis revealed that investigated wastewater treatment plants were hydraulically underloaded. Moreover it was conclude a significant variables of inflowing sewage amount. The sewage admission was the largest in spring and summer periods. Sewage volume interval most often occurring at the WTP in Przysieki was the one between 320 and 480 m3•d-1, for Kołaczyce between 290 and 320 m3•d-1 and Szebnie between 120 and 240 m3•d-1.

Keywords