E3S Web of Conferences (Jan 2019)

Arrangement of construction joints in cast-in-place slabs

  • Yakovleva Irina,
  • Kurochkina Valentina

DOI
https://doi.org/10.1051/e3sconf/20199704023
Journal volume & issue
Vol. 97
p. 04023

Abstract

Read online

Within latest decades cast-in-place construction of residential houses has been actively developed. Works on erection of cast-in-place frame of the building are normally performed by phases, which results in a necessity to arrange construction joints of concreting. In accordance with regulatory documents, it is allowed to arrange construction joints in any place of the slab, in parallel with its less side. As well, it is necessary to observe the technology for joint arrangement. As practice shows, observing only technology of construction joint arrangement is insufficient to provide for strength properties of cast-in-place reinforced-concrete slabs. This article provides an analysis of actual geodetic pre-construction surveys, design and theoretically-calculated solutions; case study is a multistoried building under construction. On which basis, excessive slab deflections in the places of construction joints, were detected. It is established, that the main reason for deflection occurrence is early removal of slab formwork and installation of supports for temporary supporting. On the basis of obtained findings authors make conclusions regarding compulsory observance of the technology for construction joint arrangement, regarding a necessity to remove formwork according to common standards 70.13330.2012; as well, it is recommended to leave formwork under construction joints until concrete gains 100% of ruggedness.