PLoS ONE (Jan 2023)

Impact of inundation range of overtopping dam break of tailings pond under actual terrain conditions.

  • Changbo Du,
  • Ben Niu,
  • Fu Yi,
  • Xinqi Jiang,
  • Lidong Liang

DOI
https://doi.org/10.1371/journal.pone.0295056
Journal volume & issue
Vol. 18, no. 12
p. e0295056

Abstract

Read online

Tailing ponds are a major hazard source with the risk of dam breaks. To predict the impact of tailings pond dam breaks more accurately, one needs to quantitatively understand the dam-breaking process of the tailings reservoir and its downstream impact. This study is based on an old tailings pond that is about to be put out of service and the proposed new tailings pond next to it. Study the inundation range of the new and old tailing ponds with simultaneous overtopping dam breaks under actual terrain conditions. First, fine-grained tailings and expanded perlite were selected as the model sand materials, and the appropriate model sand ratio was determined through laboratory tests. Second, the two tailings ponds were tested (at a scale of 1:200), for flood overtopping and simultaneous dam breaks. The dam break, flow, section morphology evolution, submerged elevation, and range were analyzed. Finally, a numerical model was developed using MIKE 21 to simulate the simultaneous overtopping and collapse of the new and old tailings ponds, and the impact of rainfall intensity on the inundation range of the simultaneous overtopping of the dam was analyzed. The research results will guide disaster prevention and mitigation in tailings reservoirs.