Open Engineering (Jul 2019)

Modeling of the harmonization method for executing a multi-unit construction project

  • Tomczak Michał

DOI
https://doi.org/10.1515/eng-2019-0036
Journal volume & issue
Vol. 9, no. 1
pp. 282 – 291

Abstract

Read online

One of the key problems in managing the realization of a construction project is the selection of appropriate working crews and coordinating their activities in a way that ensures the highest degree of implementation of defined goals (minimizing the project duration and/or reducing downtime and related costs). Most of the existing methods of work harmonization used in construction industry allow obtaining the desired results only in relation to the organization of the processes realization in repetitive linear projects. In case of realization of non-linear construction objects or construction units, it is usually necessary to choose between the reduction of the project implementation time and maintaining the continuity of crews work on the units. It was found that there is a lack in the literature of developed method enabling harmonization of crews’ work, while minimizing the downtime at work and the duration of the entire project taking into account additional constraints, e.g. the need to not exceed the deadlines for the realization of the project stages.

Keywords