Archives of Control Sciences (Jun 2017)

Cyclic flow shop scheduling problem with two-machine cells

  • Bożejko Wojciech,
  • Gnatowski Andrzej,
  • Idzikowski Radosław,
  • Wodecki Mieczysław

DOI
https://doi.org/10.1515/acsc-2017-0009
Journal volume & issue
Vol. 27, no. 2
pp. 151 – 167

Abstract

Read online

In the paper a variant of cyclic production with setups and two-machine cell is considered. One of the stages of the problem solving consists of assigning each operation to the machine on which it will be carried out. The total number of such assignments is exponential. We propose a polynomial time algorithm finding the optimal operations to machines assignment.

Keywords