Abstract

Read online

Fast cut back (FCB) function can make the power station restore the external power supply in a very short period of time from the auxiliary power operation conditions through self-help mode. In case of large-scale power grid failure, FCB further ensures the safety of the main equipments and bring great benefits for the rapid recovery of local power grid. Taking Taishan Power Plant 1000 MW unit as a research object, the feasibility scheme of adding FCB function was analyzed and demonstrated on the basis of making full use of the original equipment design margin. The FCB test of TMCR 100% load was completed. The test results and problems during FCB process were discussed, and the corresponding countermeasures were proposed.