Глобальная ядерная безопасность (Aug 2022)

Integral Logistics in NPP Unit Decommissioning Project

  • A. I. Berela,
  • S. A. Tomilin,
  • A. G. Fedotov,
  • E. S. Arsenteva

DOI
https://doi.org/10.26583/GNS-2020-03-03
Journal volume & issue
Vol. 0, no. 3
pp. 40 – 45

Abstract

Read online

The paper considers the integral logistics of the dismantling work stage during the decommissioning of NPP units and the feasibility of its presentation in the corresponding project. The features of the logistic approach to the organization of dismantling works and subsequent operations of handling dismantled products are shown.

Keywords