International Journal of Pioneering Technology and Engineering (Dec 2024)
Feasibility Study and Economic Analysis for Hydroelectric-PV Hybrid System Performed with PVsyst Software
Abstract
While energy demand is increasing day by day with the developing technology, the decrease in traditional energy sources and the negative effects of carbon emissions on the environment encourage countries to turn to sustainable and environmentally friendly renewable energy sources. Requirements such as the periodic change of renewable energy resources depending on weather conditions and the optimum use of existing resources have made it attractive to use different renewable energy resources together. In this paper, the feasibility study of a hybrid energy system for Akfen Renewable Energy's Gelinkaya Hydroelectric Power Plant (HPP) with an installed capacity of 6,866 MW, located in Aziziye district of Erzurum province. In the study, the economic analysis of the hybrid model resulting from the integration of Gelinkaya HPP with SPP (Solar Power Plant) using PVsyst software is discussed. The acceptance of Gelinkaya HPP by the Ministry of Energy was made on June 14, 2013 and the power plant started electricity generation activities. Since this date, the average annual electricity generation value of the power plant has been 10.062.411 MWh and the capacity factor has been realized as 16.73%. With the analysis of the HPP-SPP hybrid system, it was observed that the power plant was able to generate an average of 12.491 MWh more electricity per year by contributing to electricity generation, especially during irrigation periods, and the capacity factor increased to 37.50%.
Keywords