Tehnika (Jan 2016)

Applied methodology for replacement pipe arcs in integral pipelines TE 'Oslomej'

  • Temelkoska Bratica K.,
  • Cvetanoski Radomir K.

DOI
https://doi.org/10.5937/tehnika1602249T
Journal volume & issue
Vol. 71, no. 2
pp. 249 – 254

Abstract

Read online

The integral pipelines in thermal power plants present a linear spatial bearing construction with high operating parameters, complex static and dynamic load. The integral pipelines along its entire length are hanging on construction spring hangers from the boiler building, where the boiler is placed, next to the machine hall where the turbine is placed. Therefore, it is important to monitor the condition and to remove any possible defects from the applied methods. This paper describes the methodology of replacement of the pipe arch on one of the integral pipelines-the line for hot superheated steam. In addition, in this paper are given the method methods that led to this methodology for testing and evaluation of the condition of the pipe arch material that had been in exploitation and the new pipe arch that will be embedded. Furthermore the approach, the technology of replacement, anchoring of the steam line, technology of welding etc., as well as the preparation of the final design of constructed condition are also covered in this paper.

Keywords