Slovak Journal of Civil Engineering (Jun 2024)

Construction Management by Controlling the Design and Curing Time of a Concrete Mix

  • Darvishvand Hamid Reza,
  • Taghia Seiyed Ali Haj Seiyed,
  • Afshari Navid

DOI
https://doi.org/10.2478/sjce-2024-0012
Journal volume & issue
Vol. 32, no. 2
pp. 38 – 47

Abstract

Read online

The interval of time after pouring concrete is an important factor, which directly affects the timing and cost of construction. The case study that was investigated in this research, is a tunnel project located in Iran. Eighteen mix designs were prepared using properties such as different water-cement ratios and the use of two types of superplasticizer with different dosages. The optimal mix designs among the samples were separately specified.