Archives of Civil Engineering (Dec 2019)

Model of Construction Subcontractors Selection with Time Windows for their Availability

  • Biruk S.,
  • Jaskowski P.,
  • Krzemiński M.

DOI
https://doi.org/10.2478/ace-2019-0061
Journal volume & issue
Vol. 65, no. 4
pp. 295 – 307

Abstract

Read online

Most construction projects involve subcontracting some work packages. A subcontractor is employed on the basis of their bid as well as according to their availability. A viable schedule must account for resource availability constraints. These resources (e.g. crews, subcontractors) engage in many projects, so they become at the disposal for a new project only in certain periods. One of the key tasks of a planner is thus synchronizing the work of resources between concurrent projects. The paper presents a mathematical model of the problem of selecting subcontractors or general contractor’s crews for a time-constrained project that accounts for the availability of contractors, as well as for the cost of subcontracting works. The proposed mixed integer-binary linear programming model enables the user to perform the time/cost trade-off analysis.

Keywords