Engineering Proceedings (Oct 2023)
An Optimization-Based Case Study of Aluminum Pedestrian Bridge Decks
Abstract
In Sweden, steel bridges are the most common solution regarding prefabricated short-span (15–35 m) pedestrian bridges. The most common bridge type for this application is a carbon steel truss bridge with an orthotropic deck consisting of a 10–12 mm deck plate and trapezoidal stiffeners. For these bridges, the deck is the main driver regarding economic and environmental costs, originating from, e.g., high material consumption and maintenance activities. This paper aims to compare the economic aspects between a conventional steel deck and an extruded aluminum deck from an investment cost perspective. The aluminum deck is homogenous, i.e., containing no mechanical connections. To perform this case study, an optimization routine is developed and executed for the aluminum alternative. This optimization study targets the minimum weight and is constrained by the Eurocode design code. A sub-model approach is adopted for the numerical analysis, based on shell and solid elements. The procedure to go from a cross-section defined by a set of parameters to reach the optimized bridge deck is presented. The studies that are reported in this paper show that the developed optimization routine gives satisfactory results. Furthermore, they indicate that homogenous extruded aluminum decks can be a viable deck option for pedestrian bridges.
Keywords