Energies (Aug 2021)

Community Capacity-Building Mobilization towards Energy Transitions in the Era of Thailand 4.0: A Case Study on Biomass Power Plants

  • Yuttana Homket,
  • Pongthep Sutheravut,
  • Sawpheeyah Nima

DOI
https://doi.org/10.3390/en14175219
Journal volume & issue
Vol. 14, no. 17
p. 5219

Abstract

Read online

In 2015, the National Energy Policy Council (NEPC) approved the latest Alternative Energy Development Plan (AEDP) 2015–2036, targeting electricity generation from biomass, biogas, and municipal solid waste by 2036 towards the Thailand 4.0 policy. The small biomass power plants are intensively promoted, contributing to many more public concerns. Therefore, this study provided new insight using the readiness and resilience in the communities near the biomass power plant generation in Southern Thailand. The community readiness model (CRM) and community health impact assessment (CHIA) were adopted using mixed methods during January–November 2019. A total of 999 respondents replied to the questionnaires, 153 informants were interviewed, and the panel was discussed and analyzed by descriptive statistics and content analysis. Findings illustrated that all stakeholder sectors strengthened community-driven development based on the average community readiness (3.01 ± 0.11) in a vague awareness stage, only with participation in information giving (75.38%) and having an impact pain point score of 7.64 ± 0.54, which was a highly intense level used to develop the public policy towards biomass power plants. Recent advanced community tools offered new insights for the first time about community strategic plans for sustainable biomass power generation, to achieve community security and values of democracy in Southern Thailand.

Keywords