Podzemni Radovi (Jan 2014)

Functional dependence on construction costs of horizontal mining facilities in lead-zinc ore

  • Doneva Nikolinka,
  • Hadži-Nikolova Marija,
  • Lutovac Suzana

DOI
https://doi.org/10.5937/podrad1424011D
Journal volume & issue
Vol. 22, no. 24
pp. 11 – 19

Abstract

Read online

This paper presents a methodology for determination of the two parameter dependence on construction costs of horizontal mining facilities in the lead-zinc ore. Construction costs are shown as a function of the profile area on facilities and the degree of jointed on the rock, presented by the change in their uniaxial compressive strength.

Keywords