Optimization of production system of shale oil development in Ordos basin, China

  • Xiaolong Wan,
  • Shuwei Ma,
  • Jianming Fan,
  • Yuanli Zhang,
  • Chao Zhang

DOI
https://doi.org/10.1038/s41598-023-33080-8
Journal volume & issue
Vol. 13, no. 1
pp. 1 – 10

Abstract

Read online

Abstract In this paper, production system (PS) of shale oil is optimized according to production data and indoor experiments, including core and fluid tests. Results showed that: ① Pressure drop rate at wellhead is a reasonable reference for the determination of post-fracture shut-in duration (PFSID). When pressure at a wellhead of horizontal well is relatively stable and the pressure drop less than 0.1 MPa per day for three consecutive days, PFSID ends; ② Flowback intensity of fracturing fluid affects the effectiveness of proppant underground, thus flowback intensity can be determined by the critical flow rate and safety factor of each proppant; ③ Flowback intensity should be varied during different development stages, which could be divided into four according to production gas and oil ratio(GOR) of a shale oil horizontal well: low, medium–high, high and high-low production GOR. During the stage of low production GOR, ratio of flow pressure and saturation pressure should be maintained greater than 1.0, and the initial daily liquid productivity for a hundred-meter oil-bearing lateral length in a horizontal well is 2.4 ~ 2.9 m3/d; and during the medium–high production GOR, high production GOR and high-low production GOR stages, the responding initial daily liquid productivity should be maintained between 0.8 ~ 1.0 or less than 0.8 respectively.