A methodology to implement a closed-loop feedback-feedforward level control in a laboratory-scale flotation bank using peristaltic pumps

  • Paulina Quintanilla,
  • Daniel Navia,
  • Felipe Moreno,
  • Stephen J. Neethling,
  • Pablo R. Brito-Parada

Journal volume & issue
Vol. 10
p. 102081

Abstract

Read online

This paper describes the implementation of a level control strategy in a laboratory-scale flotation system. The laboratory-scale system consists of a bank of three flotation tanks connected in series, which mimics a flotation system found in mineral processing plants. Besides the classical feedback control strategy, we have also included a feedforward strategy to better account for process disturbances. Results revealed that the level control performance significantly improves when a feedforward strategy is considered.This methodology uses peristaltic pumps for level control, which has not been extensively documented even though: (1) peristaltic pumps are commonly used in laboratory-scale systems, and (2) the control implementation is not as straightforward as those control strategies that use valves. Therefore, we believe that this paper, which describes a proven methodology that has been validated in an experimental system, can be a useful reference for many researchers in the field. • Preparation of reagents to ensure that the froth stability of the froth layer is representative of an industrial flotation froth. • Calibration of instruments – convert the electrical signal from PLCs to engineering units. • Tuning PI parameters using SIMC rules by performing step-changes in each flotation cell.

Keywords