Pamukkale University Journal of Engineering Sciences (Jan 2002)

TIME ANALYSIS ACCORDING TO PART PROGRAMS ON A CNC VERTICAL MACHINING CENTER

  • Ahmet Murat PİNAR,
  • Abdulkadir GÜLLÜ

Journal volume & issue
Vol. 8, no. 1
pp. 42 – 51

Abstract

Read online

In this study, a program examining the CNC programs in the control unit of Dyna Myte 2900 Vertical Machining Center and calculating the machining time and rapid movement time of the cutting tools has been developed. The workpiece program to be examined is transferred to CNC code editor by the user manually, by a computer file with a diskette, or through hard disk or the machine tool. By examining all the movements of the cutting tools, detailed machining time, rapid movement time or total time is served to the user. So that, an important part of workpiece cost analysis information is provided.

Keywords