Critical Care (Jun 2022)

Respiratory distress observation scales to predict weaning outcome

  • Maxens Decavèle,
  • Emmanuel Rozenberg,
  • Marie-Cécile Niérat,
  • Julien Mayaux,
  • Elise Morawiec,
  • Capucine Morélot-Panzini,
  • Thomas Similowski,
  • Alexandre Demoule,
  • Martin Dres

DOI
https://doi.org/10.1186/s13054-022-04028-7
Journal volume & issue
Vol. 26, no. 1
pp. 1 – 9

Abstract

Read online

Abstract Background Whether dyspnea is present before starting a spontaneous breathing trial (SBT) and whether it may affect the outcome of the SBT is unknown. Mechanical Ventilation—Respiratory Distress Observation Scale (MV-RDOS) has been proposed as a reliable surrogate of dyspnea in non-communicative intubated patients. In the present study, we sought (1) to describe the evolution of the MV-RDOS during a SBT and (2) to investigate whether MV-RDOS can predict the outcome of the SBT. Methods Prospective, single-center study in a twenty-two bed ICU in a tertiary center. Patients intubated since more 48 h who had failed a first SBT were eligible if they meet classical readiness to wean criteria. The MV-RDOS was assessed before, at 2-min, 15-min and 30-min (end) of the SBT. The presence of clinically important dyspnea was inferred by a MV-RDOS value ≥ 2.6. Results Fifty-eight patients (age 63 [51–70], SAPS II 66 [51–76]; med [IQR]) were included. Thirty-three (57%) patients failed the SBT, whose 18 (55%) failed before 15-min. Twenty-five (43%) patients successfully passed the SBT. A MV-RDOS ≥ 2.6 was present in ten (17%) patients before to start the SBT. All these ten patients subsequently failed the SBT. A MV-RDOS ≥ 2.6 at 2-min predicted a SBT failure with a 51% sensibility and a 88% specificity (AUC 0.741 95% confidence interval [CI] 0.616–0.866, p = 0.002). Best cut-off value at 2-min was 4.3 and predicted SBT failure with a 27% sensibility and a 96% specificity. Conclusion Despite patients met classical readiness to wean criteria, respiratory distress assessed with the MV-RDOS was frequent at the beginning of SBT. Measuring MV-RDOS before to initiate a SBT could avoid undue procedure and reduce patient’s exposure to unnecessary mechanical ventilation weaning failure and distress.

Keywords