Transport Problems (Jan 2013)
Influence of the freight transnational rail liner service on the train scheduling in case of major corridors
Abstract
In this paper we discuss several consequences of the freight transnational rail liner service on the rail corridor capacity. The Northern part of the IVth TEN-T corridor on Romanian territory has specific feature related to the passenger flows connecting important Romanian demographic and economic clusters, on one side, and on the other side, to its diagonal crossing aspect, from the Western border to the Constanta port, connecting the Central Europe countries to the Black Sea regions, which means that there are a lot of expectation in terms of this corridor rail capacity: this corridor will, be for a long time further, the single and first completed continuous upgraded and modernised rail corridor. Its utilization will necessarily be heterogeneously planned (meaning for passengers rapid trains and freight rapid trains, from domestic/internal market, but especially for external market of Romania). In this paper, we consider a simple mathematical model for the calculus of capacity in two different cases: for a homogeneous utilization, meaning that all trains have the same running speeds and for heterogeneous utilization, when the passenger trains have the higher speed and hence, the higher priority over the freight trains, even if some of them are freight transnational liner service. Special feature of liner rail service has to be considered (fixed schedule, no stops for passenger train advance). We draw several useful possible solutions to be considered in order to preserve the active corridor capacity, and to assure a smooth flow for the transnational liner services, which ultimately will enhance the rail attractiveness.