PLoS ONE (Jan 2015)

Intelligent Scheduling for Underground Mobile Mining Equipment.

  • Zhen Song,
  • Håkan Schunnesson,
  • Mikael Rinne,
  • John Sturgul

DOI
https://doi.org/10.1371/journal.pone.0131003
Journal volume & issue
Vol. 10, no. 6
p. e0131003

Abstract

Read online

Many studies have been carried out and many commercial software applications have been developed to improve the performances of surface mining operations, especially for the loader-trucks cycle of surface mining. However, there have been quite few studies aiming to improve the mining process of underground mines. In underground mines, mobile mining equipment is mostly scheduled instinctively, without theoretical support for these decisions. Furthermore, in case of unexpected events, it is hard for miners to rapidly find solutions to reschedule and to adapt the changes. This investigation first introduces the motivation, the technical background, and then the objective of the study. A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue. The method and related algorithms which are used in this instrument are presented and discussed. The proposed method was tested by using a real case of Kittilä mine located in Finland. The result suggests that the proposed method can considerably improve the working efficiency and reduce the working time of the underground mine.