Annals of the Oradea University: Fascicle Management and Technological Engineering (Jul 2019)

Lead time reduction and increasing productivity by implementing lean manufacturing methods in cnc processing center

  • I C Gherghea,
  • C Bungau,
  • D C Negrau

DOI
https://doi.org/10.15660/AUOFMTE.2019-1.3406
Journal volume & issue
Vol. Volume XXVIII (XVIII), 2019/1, no. 1

Abstract

Read online

No abstracts available.