International Journal of Industrial Engineering Computations (Jan 2025)

You are entitled to access the full text of this document A novel hybrid algorithm of cooperative variable neighborhood search and constraint programming for flexible job shop scheduling problem with sequence dependent setup time

  • Yajie Wu,
  • Shiming Yang,
  • Leilei Meng,
  • Weiyao Cheng,
  • Biao Zhang,
  • Peng Duan

DOI
https://doi.org/10.5267/j.ijiec.2024.11.003
Journal volume & issue
Vol. 16, no. 1
pp. 21 – 36

Abstract

Read online

This study focuses on the flexible job shop scheduling problem with sequence-dependent setup times (FJSP-SDST), and the goal is minimizing the makespan. To solve FJSP-SDST, first, we develop a constraint programming (CP) model to obtain optimal solutions. Due to the NP-hardness of FJSP-SDST, a CP assisted meta-heuristic algorithm (C-VNS-CP) is designed to make use of the advantages of both CP model and cooperative variable neighborhood search (C-VNS). The C-VNS-CP algorithm consists of two stages. The first stage involves C-VNS, for which eight neighborhood structures are defined. In the second stage, CP is used to further optimize the good solution obtained from C-VNS. In order to prove the efficiency of the C-VNS algorithm, CP model, and C-VNS-CP algorithm, experiments of 20 instances are conducted.