Advances in Civil Engineering (Jan 2024)
Decision-Making Evaluation and Optimization Strategies for Construction EPC Project Developers Utilizing BIM Technology
Abstract
In the context of the advancing construction engineering field in China, there has been a significant increase in the adoption of building information modeling (BIM) technology within engineering–procurement–construction (EPC) projects. This emerging technology is expected to significantly influence the decision-making practices of professionals in the construction and engineering domain. Consequently, there is an urgent need for comprehensive research focused on construction management specifically pertaining to the effectiveness of construction developer management. This study examines seven representative EPC projects where BIM technology was implemented and it considers various factors that have the potential to influence project decision-making while taking into account time and cost considerations. A comprehensive multidimensional evaluation method that combines the analytic hierarchy process (AHP) and the fuzzy comprehensive evaluation method is introduced in this study. The results of this study emphasize that the efficiency enhancement strategies derived from the judgment indicator method demonstrate favorable practical outcomes. This research highlights the importance of a comprehensive evaluation method combining the AHP and the fuzzy comprehensive evaluation method to enhance decision-making efficiency for construction developer management staff.