Journal of Engineering Science and Technology (Feb 2015)

A STUDY ON OPTIMISATION OF RESOURCES FOR MULTIPLE PROJECTS BY USING PRIMAVERA

  • B. S. K. REDDY,
  • SK. NAGARAJU,
  • MD. SALMAN

Journal volume & issue
Vol. 10, no. 2
pp. 235 – 248

Abstract

Read online

Resources play vital role in construction projects. The performance of construction industry depends chiefly on how best the resources are managed. Optimisation play pivotal role in resource management, but task is highly haphazard and chaotic under the influence of complexities and vastness. Management always looks for optimum utility of resources available with them. Hence, the project management has got important place especially in resource allocation and smooth functioning with allocated budget. To achieve these goals and to exercise enhance optimisation certain tools are used for resource allocation optimally. Present work illustrates resource optimisation exercises on two ongoing projects in Dubai, UAE. Resource demands of project A & B are individually levelled and observed cumulative requirement is 17475. In other option demands of projects A & B are aggregated and then together levelled, the necessary resource observed is 16490. Comparison of individually levelled and then combined option with aggregated and then levelled clearly indicates reduction in demand of resources by 5.65% in later option, which could be best considered for economy.

Keywords