EPJ Web of Conferences (Jan 2024)

Finalizing Transition to the New Data Center at BNL

  • Latif Imran,
  • Misawa Shigeki,
  • Zaytsev Alexandr

DOI
https://doi.org/10.1051/epjconf/202429507021
Journal volume & issue
Vol. 295
p. 07021

Abstract

Read online

Computational science, data management and analysis have been key factors in the success of Brookhaven National Laboratory's scientific programs at the Relativistic Heavy Ion Collider (RHIC), the National Synchrotron Light Source (NSLS-II), the Center for Functional Nanomaterials (CFN), and in biological, atmospheric, and energy systems science, Lattice Quantum Chromodynamics (LQCD) and Materials Science, as well as our participation in international research collaborations, such as the ATLAS Experiment at Europe's Large Hadron Collider (LHC) at CERN (Switzerland) and the Belle II Experiment at KEK (Japan). The construction of a new data center is an acknowledgement of the increasing demand for computing and storage services at BNL in the near term and enable the Lab to address the needs of the future experiments at the High-Luminosity LHC at CERN and the Electron-Ion Collider (EIC) at BNL in the long term. The Computing Facility Revitalization (CFR) project is aimed at repurposing the former National Synchrotron Light Source (NSLS-I) building as the new data center for BNL. The construction of the new data center was finished in 2021Q3, and it was delivered for production in early FY2022 for all collaborations supported by the Scientific Data and Computing Center (SDCC), including STAR, PHENIX and sPHENIX experiments at RHIC collider at BNL, the Belle II Experiment at KEK (Japan), and the Computational Science Initiative at BNL (CSI). This paper highlights the key mechanical, electrical, and networking components of the new data center in its final configuration as used in production since 2021Q4 and gives an overview for the extension of the central network systems into the new data center and the migration of a significant portion of IT load and services from the old data center to the new data center carried out in 20212023, with expected completion of the main phase of the gradual IT equipment replacement and migration from the old data center into the new one set to the end of FY2023 (Sep 30, 2023).