Mining and Metallurgy Engineering Bor (Jan 2014)
Remediation the tailing dump RTH in terms of stability
Abstract
Checking the dam stability of the flotation tailing dump RTH within RTB Bor, it was determined on some analyzed profiles that the stability coefficient has less value than the legally prescribed limits. This work presents the measures for bringing the stability coefficient of dam in prescribed limits to all profiles, as well as checking the stability upon implementation of remedial measures.
Keywords