Journal of Energy in Southern Africa (Oct 2017)

Measurement and verification of a municipal water pumping project

  • I E Bosman,
  • L J Grobler

DOI
https://doi.org/10.17159/2413-3051/2006/v17i1a3365
Journal volume & issue
Vol. 17, no. 1
pp. 42 – 49

Abstract

Read online

The processes that were followed to develop the baseline to Measure and Verify (M&V) a Municipal Demand Side Management (DSM) water pumping project that is being implemented is described in this paper. This paper is a follow-up on a previous paper presented at the ICUE 2004 (Measurement and Verification of a Municipal Water Pumping Project). The previous paper described the M&V process and the methodology that would be used to develop the baseline for the project. The project is currently in the implementation phase. To develop the baseline, energy data was recorded for all the pumps as well as the total flow from the pump station. The baseline was developed by determining an average 30 minute weekday, Saturday and Sunday profile. The baseline also includes a relation between daily water pumped and electricity consumption. Therefore, the baseline can be adjusted if the total amount of water pumped daily is lower or higher than the average values used. This will ensure that the baseline takes possible load growth or possible load reduction into consideration. The baseline will be used to determine the impact of the project after implementation.

Keywords