Стратегические решения и риск-менеджмент (Jun 2015)

METHODS OF FINANCING AND PRICING OF DEVELOPMENT - DESIGN DEVELOPMENT OF AERONAUTICAL ENGINEERING DEFENSE

  • V. P. Panagushin,
  • V. Y. Ivanisov

DOI
https://doi.org/10.17747/2078-8886-2015-2-2
Journal volume & issue
Vol. 0, no. 2
pp. 72 – 83

Abstract

Read online

The evaluation of the cost of development - development (R & D) at the conclusion of the state contract is proposed to conduct an estimated price of the replacement steps of the current standard OCD OCD stages, which are adequate and include several stages. At each stage, the limit is determined by the estimated price of the ROC, while retail prices are determined by the following steps and stages of their amount. Upon completion of all stages of the ROC, it is converted indicative price stages and the ROC in the fixed-price into the cost to the planned profit.