High Temperature Materials and Processes (Dec 2015)

High-Temperature Graphitization Failure of Primary Superheater Tube

  • Ghosh D.,
  • Ray S.,
  • Roy H,
  • Mandal N.,
  • Shukla A. K.

DOI
https://doi.org/10.1515/htmp-2014-0137
Journal volume & issue
Vol. 34, no. 8
pp. 777 – 781

Abstract

Read online

Failure of boiler tubes is the main cause of unit outages of the plant, which further affects the reliability, availability and safety of the unit. So failure analysis of boiler tubes is absolutely essential to predict the root cause of the failure and the steps are taken for future remedial action to prevent the failure in near future. This paper investigates the probable cause/causes of failure of the primary superheater tube in a thermal power plant boiler. Visual inspection, dimensional measurement, chemical analysis, metallographic examination and hardness measurement are conducted as the part of the investigative studies. Apart from these tests, mechanical testing and fractographic analysis are also conducted as supplements. Finally, it is concluded that the superheater tube is failed due to graphitization for prolonged exposure of the tube at higher temperature.

Keywords