Vojnotehnički Glasnik (Jul 2001)

Development of a task planning information subsystem

  • Alempije Veljović ,
  • Zoran Eremija ,
  • Boško Stanković

DOI
https://doi.org/10.5937/vojtehg0105424V
Journal volume & issue
Vol. 49, no. 4-5
pp. 424 – 428

Abstract

Read online

This paper contains the procedure of design and realization of an information subsystem for task planning. The design of the task planning information subsystem was accomplished by process modeling and data modeling. The process modeling was performed in the IDEFO standard, in the CASE tool BPwin, and the data modeling in the IDEF1X standard, in the CASE tool ERwin. The BPwin and ERwin CASE tools are software suites based on IDEFO and IDEF1X standards. The database was implemented in ACCESS RDBMS.

Keywords