Dianzi Jishu Yingyong (Jan 2021)

Research on outage and power recovery voluntary report method of smart meter

  • Duan Xiaomeng,
  • Luo Ranran,
  • Guo Qingying,
  • Ji Yuntao,
  • Xu Tao

DOI
https://doi.org/10.16157/j.issn.0258-7998.200285
Journal volume & issue
Vol. 47, no. 1
pp. 52 – 56

Abstract

Read online

It′s meaningful for electricity power company to get the outage information on time. This paper proposed a new voluntary report method: Electricity energy meter generated outage event log, communication module transferred it. In order to solve the compatibility and expansibility disadvantages of current scheme, this paper proposed a power recovery voluntary report and broadcast timing method, realized closed loop management of outage maintenance and repair, and solved the wrong clock problem caused by battery low voltage after outage. This paper introduced the design thoughts of next generation smart meter,and put forward an outage and recovery voluntary report and timing strategy implementation plan in next generation smart meter. This paper provides a solve plan for next generation smart meter popularization, and it′s helpful for construction of electricity energy Internet.

Keywords