Applied Sciences (Oct 2022)
Research on the Method of Temporary Prestressing to Regulate the Stress in the Section during the Construction of the Main Arch Ring of the Cantilever Cast Arch Bridge
Abstract
To control the level of tensile stress in the section of reinforced concrete arch cantilever construction, a construction control method of temporary prestressing reinforcement is proposed in this study. The influence law of temporary prestressing on the arch ring section stress is revealed based on the engineering background (Shatuo Special Bridge in Guizhou). Meanwhile, a temporary prestressing test is carried out on the ring section of the main arch to verify the effectiveness of the method. The results show that the prestressing configuration during the construction of the main arch ring of the suspension arch bridge has obvious influence on the control of tensile stress. The method can also effectively improve the force uniformity of the buckle cables, reduce the variation range of cable forces during construction, and improve the safety of arch ring construction.
Keywords