MATEC Web of Conferences (Jan 2017)
Established Method of High-Speed Railway Survey Control Network
Abstract
It is very important of high-speed railway construction surveying and mapping. Especially the establishment of construction survey control network and searching aiming at layout, measurement, data processing of adjustment calculation of the horizontal control network and the elevation control network. The most important part is the establishment of CP II and CPIII control network. The elevation control mainly adopts second order leveling. Horizontal and elevation accuracy must to meet the requirements of high speed railway construction survey.