Energies (Feb 2022)

Simulation of 15% and 50% Thermal Power Dispatch to an Industrial Facility Using a Flexible Generic Full-Scope Pressurized Water Reactor Plant Simulator

  • Stephen Hancock,
  • Tyler Westover

DOI
https://doi.org/10.3390/en15031151
Journal volume & issue
Vol. 15, no. 3
p. 1151

Abstract

Read online

Nuclear power plants in the United States are increasingly challenged to compete in wholesale electricity markets due to the low electricity costs and increasingly dynamic grid conditions from competing generation sources. An alternative market for nuclear power is industrial facilities that can use the thermal and/or electrical power generated by a nuclear power plant to offset the economic losses incurred by electricity market challenges. A generic pressurized water reactor (PWR) simulator was used to show the results of a basic design for a generic thermal power extraction system and tests were run using a set of procedures to show what happens when a nuclear power plant transitions from full electrical power dispatch to 15% and 50% thermal power dispatch. This type of operation leads to losses in turbine performance efficiency due to the deviation from the design operating point, but because the thermal power is also used by the industry load without conversion losses, the combined thermal efficiency of the PWR increases. For the 15% case, the thermal efficiency increased from 32% to 41.9%, while for the 50% case, the efficiency increased up to 60.1%. In addition, for 50% thermal power dispatch, the power dissipated by the condenser decreased from approximately 2000 to approximately 1300 MW (thermal), indicating a substantially diminished impact on the environment in terms of releasing heat into the cooling water reservoir.

Keywords