Research on the Construction Process of a Steel Truss Arch Bridge Based on BrIM

  • Li Haoze,
  • Hong HuaiRui,
  • Li Yanjun,
  • Wang Lei

DOI
https://doi.org/10.1051/e3sconf/201913604034
Journal volume & issue
Vol. 136
p. 04034

Abstract

Read online

This paper combined BrIM (Bridge Information Modeling) technology with the bridge engineering to parameterize the information of a through type truss arch bridge, and BIM technology is used for information management and construction process management. Firstly, the information such as the size and material of each member of the truss arch bridge was input to the family library to construct the three-dimensional model corresponding to the plane and elevation information, which could be used for the drawing review. Then the Navisworks roaming model was used for collision check, the design development phase of the construction drawings were achieved to component geometry and the detailed tables in Revit was used to manage the materials. At last, TimeLiner in Navisworks was utilized to design the construction process so Navisworks could simulate the construction process. It is found that BrIM technology of Revit combined with Navisworks can effectively improve the communication efficiency of all side such as construction, supervision, design and construction, facilitate the industrial prefabrication of components, reduce the component collision before the construction phase, control the schedule of construction and optimize the construction process.